Finally, at approximately 9:00 PM MDT on day five, primary assembly of the Mk5 was finished. One last test fit with the G920 gear and the folding table confirmed that everything seemed to work as advertised. Considering I went into this with basic dimensions in my head and nothing else, I was grateful to have something that might actually function as advertised.